When it comes to any project, there are two critical resources: time and money. The success or failure of any project is determined by how efficiently these resources are utilized and managed. To optimize project methodology, it is essential to minimize the expenditure of time and money.

One of the most ideal ways to accelerate the timeline is by tackling the Resource consenting, EPA (engineering processing approval), and Building consenting processes simultaneously. Although these processes are traditionally far apart in their occurrence, a parallel approach towards consenting not only helps in saving resources of stakeholders but also sets out ample time for the imminent contingencies and/or variations. This system also yields enough time for solving unforeseen contingencies and overcoming construction roadblocks.

For instance, a typical residential project site with two to three stories, subdivided into five to ten intensified lots and with typical infringements, usually goes through an 8–10-month consent approval process. At One Stop Development Consultants (OSDC), a brilliant strategy has been implemented to reduce this timeline to 4-5 months. Being able to conduct all necessary tasks simultaneously, even on 30-40 lot sites, greatly speeds up the project timeline.

OSDC has a highly efficient and multi-faceted team of specialists who carry out the Resource consenting, EPA, and Building consenting concurrently. It includes Architectural designers, Civil-Structural engineers, and Town Planners who work in a highly collaborative environment. This streamlined and perfected plan of action over the years has resulted in various design elements aligning together seamlessly during the project timeline.

Moreover, this strategy has contributed to OSDC creating a strong base of long-term repeat clients, leading the company to acquire a higher volume of projects. The high magnitude of projects has also contributed in developing a thorough risk analysis and mitigation system in the company, which enables them to manage any unforeseen costs or complications that may arise during the consent processing stages.

This allows the company to have the confidence to offer its clients, the absorption of any additional costs that may arise during the consent processing stages. This tactic also makes sure that clients are not burdened with any unexpected charges, benefitting the clients even further.

Overall, the simultaneous consent processing system saves time and maximizes profits for the client, while also establishing a reliable channel of trust and communication with investing stakeholders.